The estimate after contract award, the first original budget, the state of the current original budget as well the item (nominal values) and actual costs of the respective reporting date are shown in the cost control. The projection and the forecast to the completion date make the overall picture perfect.
The actual costs can either be taken over directly from an ERP system, be read via a file interface or entered manually.

All reporting date values are saved and can be consulted for comprehensive analyses.
The cost control therefore is also the tool with which deviations from the budgeted profit can be recognized as soon as possible. With this, an early counteracting is possible.