• Recording or read in (GAEB) of one or several bills of quantities
  • Allocation of  a calculation cost structure
  • Use of standard calculations for   
  • Direct costs
  • Element costs (specially for the turnkey construction)
  • Calculation  of indirect costs
  • Determining of the oncosts (mark-ups) in the top sheet
  • Output of the bid (report print, GAEB-interface)
  • Transfer into a contract BoQ