KUBUS K blau.gif  Kubus

Release Notes to the version 7.6

 

    open Word-Document

 

   * change to German version

 

Düsseldorf, 11th Juli 2017

 


Survey

 

Key aspects of Kubus 7.6

 

1.     Further Enhancements

Development of the function: "Edit ID´s -> search for duplicate IDs"

·        Base and variant positions are not to be considered!

 

Word processing – Spell Checker¸ Corrections in the display of texts.

·         Edit short text´s

·         Text width longtext

·         Edit text completions in the longtext

 

 BoQ-comparison and data transfer:

·         BoQ-comparison between different WI categories

·         Further enhancement  of BoQ-comparison  um die Felder: Freier Wert, Freier Text und Freier Wert in TRW

·         BoQ-comparison protected DC-BoQ´s

 

Mark-ups in the bid

·        Bid price fix in function „Change oncost allocation…“

 

Quantities survey: DA11-import

·        PRNo-page row no.s are accepted in the Value field at import

 

Excel 2013 - ExportLV.xla

·        Adaption of Excel Add-Ins and new version (5.1d1)

 

 

2.     Enhancements

Performance enhancements

·        WI-Option “Sub-items of components ....”

·        Item-related evaluation

 

 

 

3.     Operating systems and databases

The Kubus-Version 7.6 will be released for the operating systems Windows 10 and Windows Server 2012.

Furthermore the databases Oracle 11g (64 Bit) aund 12c (only 64Bit) will be released for:

-       Windows Server 2008 R2 (x64),  

-       Windows Server 2012 (x64) und  

-       Windows Server 2012 R2 (x64)

 

4.     User guide

 

New functions in the KUBUS 7.6 project structure:

·        Apply last used PS settings and selections

·        Apply last WI-views

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Compatibility

1.      This Kubus-Version is based on the database-version 44.8.

The previous Kubus-version (7.5) also requires the schema 44.8 and so that no DB evolutions are necessary when upgrading.

Databases updated to Schema 44.x can be used with the Kubus versions 7.2, 7.3, 7.4, 7.5 and 7.6. Previous versions of cube (up to 7.1) can not be used with 44.x DBs.

2.     Only reports- and export form sheet – libraries of the version 49.1 can be used with this Kubus-Version.

3.     This Kubus-Version works with the version 5.3 of the item data interface. This is not downwards compatible with previous versions.

 

 

 

 

General remarks

In this document, new or improved functions as well as solved and existing problems of the Kubus-Version 7.6 are described.

All solved ("Fixed") problems, which are enlisted in this document, are closed ("Closed") 2 months after the delivery of the version 7.6, if no reply is received from the customer. Naturally, there is an option to reopen a closed ticket in case of a separate request.

The Support (Hotline, Consulting, etc.) is provided only for the latest Kubus-Version as well as for the two previous versions.

We point out here that the Hardware-, Operating system- and Database requirements, which are necessary for the operations of Kubus, are provided by us any time on request in the latest version.

In case of installing a new Kubus-Version, we recommend to install also available updates for the appropriate version. Those can be downloaded from the Capgemini-Server (www.de.capgemini.com/KUBUS).

 

 

 

 

 

 

 

 

 

 

Contents

1        Functional enhancements. 8

1.1   General 8

1913860, 1913862   Funktion Edit ID, search for duplicate IDs  8

2000139   Option management: Table, Column Width, Layout 8

2059348   PS extention - Customisations in the user guidance  8

1.2   Bid. 9

2032276   Improve the default GUI behavior of table cells  9

2047627   Cost type groups, Generation of values and representation  9

2063975   Column widths in the dialog UP-shares / Currency shares  9

2033437   Bid: Dialog Cost type groups  9

2041888   Bid: Define Cost type position / group  9

1.3   Contract-BoQ.. 10

1409910   Overhead costs with more than two decimal places  10

1.4   Direct costs. 10

1947414   Calculation of Discount factor, replace term "cumulative" 10

2031029   DC-BoQ: Editing of text completions  10

1.5   Top sheet 10

1449025   Top sheet: Enhancement in Indirect costs  10

1.6   BoQ general 10

1896830   Duplicate window for short text 10

2001245   Display long text 10

1879950   BoQ comparison, further Enhancements  10

2026423   BoQ comparison between different WI categories  11

2040422   Short text editing  11

1.7   Quantities survey. 12

1935261   Runtime quantity survey - view REB recording  12

1.8   Textcontrol 12

2038348   long text initialization fails  12

2        Solved Problems. 13

2.1   General 13

1881748   The Filter of the work item direct costs remains active also in the bid  13

2.2   AFK. 13

1986869   Options dialog with hourglass (wait cursor) 13

1945203   Change OH German/English  13

1947433   OH not available  13

1988446   Excel AddIn for Office 2013  13

2071776   View long text - Text completions - Performance  14

2.3   Tender-BoQ.. 14

1913027   Bid and direct costs are filtered -> close bid  14

1913027   Fixed bid price is not constant with UP shares 0.0  14

2033450   Checking oft the cost type distribution algorithm   14

2036146   Bid price not fix during input UP-fixed line  14

2054769   Rounding algorithmics bid oncost 14

2062696   Oncost algorithmics for surcharge items in the bid  15

2065485   Oncost distribution: special items  15

2.4   Contract-BoQ.. 16

1957407   Problem with OC in EaCa/OB  16

1997028   View "Input Inv-/Perf-quantities" after funct.: Open related BoQ   16

1997423   View "Input Inv-/Perf-quantities“ NOK  16

2.5   Reports. 16

1925639   Bid: Report bid  16

2013098   Quantity survey: report „Enclosure to invoice“ 16

2.6   DC. 17

1949361   Value / Time Analysis, display of BoQ structure  17

1986643, 1986823   BoQ option: Display also sub-items of the components  17

2051352   Number of items in the basic data in minus  17

2.7   Export templates. 18

2031875 Subco: Import GAEB 90 D84  18

2.8   Im- and Export 18

1915849   Subco: Import GAEB 90 D84  18

2.9   Calendar 18

1895812   Input date generates error message  18

2017709   Input working day dayinformations  18

2015165/2023010   Calendar: Value working hours / day possibly incorrect 19

2022077   Calendar: Working hours are not updated  19

2.10 Cost control 19

1952618   Amount in the variation order at reporting date change in CCtrl 19

2002261  Exp. actual incorrect in Ct 19

1999896  New  CCtrl  -> Kubus stopped  19

2.11 Costs elements. 19

2.12 BoQ´s general 20

2048791  BoQ comparison: Source BoQ protected against modification  21

2056464  BoQ comparison: Editing dialogs  21

2057206  BoQ comparison: Printing CCY; TCY  21

2057237  BoQ comparison: Report interface  21

2061766  Long text window  22

2071665  Long text window – Text completion  22

2.13 Quantities Survey. 22

1928062   QSurv: Open REB view  22

1930209   Error in HTStructure: The ID is incompatible! 22

2015134   QSurv: Error in DA11 Imports  22

2043649   QSurv: Position-related analysis incorrect 22

2.14 Average wages. 23

1923419   AW: Views are not displayed correctly  23

2.15 Subcontractor evaluation. 23

1905922   Subco-sub descriptions in the Enquiry WI 23

1936834   Subco-BI: Costs can´t returned back (from EARS00001933986) 23

1937911   Subco-BoQ: Cost return with quantities in s-items. 23

1937926   Subco-BoQ: return to CTK of items with sub-items (from EARS00001933986) 23

1938399   Subco-BoQ: return to CTK of items (from EARS00001933986) 23

1938399   Subco-BoQ + Cost elements, Editing long text 24

2039168   Subco-BoQ: Drag & Drop incorrect 24

2034553   Subco-BoQ: Create s-items via D&D  24

2033765   Subco-BoQ: Create s-items via D&D  24

2061226   Subco-BoQ - tender evaluation table "incomplete bids" 24

2.16 Projectcalendar 25

2040760   Delete input of the current day  25

2.17 Masterdata. 25

1922079   Copy masterdatas: currencies NOK  25

2.18 Component-LV. 25

1961162   Components-BoQ field total Quantity and multitasking  25

2.19 Currency. 25

1925972   Delete duplicate Currencies  25

3        Current problems. 26

3.1   Contract-BoQ.. 26

210844          Variation order and Oncost 26

 

1       Functional enhancements

1.1      General

1913860, 1913862   Funktion Edit ID, search for duplicate IDs

When checking an BoQ, whether IDs are duplicated or in the right order, base and variant positions, which by definition have the same ID, are no longer considered.

 

2000139   Option management: Table, Column Width, Layout

In Option management, under Column Properties Table, the frame has now been adjusted so that the column "Activability" is now displayed completely.

 

2059348   PS extention - Customisations in the user guidance

General:

To use the new functionality, user-dependent data are stored.

These data to be stored are settings of a KUBUS user session.

They are therefore stored in the user registry in the same way as the PS filter settings.

The new functions are controlled by two new buttons, which were added to the PS structure filter dialog.

 

Extentions:

1. The last open / close states of the DB category and DB nodes should be restored during the next PS setup.

2. The last used / opened "PS nodes" should be preselected during the next PS setup

3. The PS filter tree should be better synchronized with the PS view (opening and selecting of the analog node)

These three functions are activated in the PS filter dialog by selecting the check box "Use last used PS settings and selectings".

4. The last used / opened views should be opened again by double-clicking or by returning to the work item name.

This function is activated in the PS filter dialog by selecting the check box "Use last used work item views".

If these checkboxes are unchecked, the old PS behavior is effective.

 

 

 

 

1.2              Bid

2032276   Improve the default GUI behavior of table cells

The indication behavior of the cells after calling the funktion "Change oncost allocation.." in the "Table" view of the offer has been improved.

 

2047627   Cost type groups, Generation of values and representation

The display of the cells of Cost type groups (readonly or editable) in the view "table" of the offer has been improved.

 

2063975   Column widths in the dialog UP-shares / Currency shares

The columns in the dialog function "Define UP shares ..." in tge bid have now been broadened

- in the tab Cost type groups the column: UP shares

- in the tab Currency shares the column: short text

 

2033437   Bid: Dialog Cost type groups

The dialog "Define Cost type positions/groups" has been revised. Depending on the selection, the bid sum remains fixed and the selected settings remain even after closing and opening KUBUS

 

 

2041888   Bid: Define Cost type position / group

In the dialog Define Cost type position / group, the BoQs associated with the offer are displayed open with the first level.

 

1.3              Contract-BoQ

1409910   Overhead costs with more than two decimal places

In Option management of the contract-BoQ the number of decimal places can be set for the overhead costs (default: two decimal places).

This specification is taken into account in the basic data of the contract-BoQ; i.e. more than two decimal places can be considered.

 

1.4              Direct costs

1947414   Calculation of Discount factor, replace term "cumulative"

The term "Cumulative Computation of the discount factor " was replaced by " Multiplicative calculation of the discount factor ". (7.5 Upd. A)

 

2031029   DC-BoQ: Editing of text completions

The editing of the text completion was reviewed.

If the protection "Protect service description" is canceled in DC-BoQ, the text completions may also be changeable. (7.5 Upd. C).

 

1.5      Top sheet

1449025   Top sheet: Enhancement in Indirect costs

In the top sheet, the indirect costs for the selected sales-related IC are now displayed in brackets in ECY, as well as the percentage drawn on the bid price.

 

1.6      BoQ general

1896830   Duplicate window for short text

Double-click on the short text field opens not a short text window any more. The short text can only be accessed and edited via the standard view: "Short text".

 

2001245   Display long text

An additional checkbox was installed in the option management, with which the set text width can be activated or deactivated.

The setting occured via the node: KUBUS -> tab: RTF text view format - text width.

If the checkbox is activated, the text width is automatically updated in open long text views. This also applies to all text views.

 

 

1879950   BoQ comparison, further Enhancements

The values from the fields "Free text", "Free value" and "Free value in TCY" can now also be compared and accepted with the BoQ comparison.

2026423   BoQ comparison between different WI categories

The BoQ comparison is now also possible between WI´s of different BoQ categories.

Furthermore, with this extension, a value / several values can now be transferred from a P (position) into each corresponding P with an equal ID independent of the WI type.

- Step 1: transfer the values per position P into free columns using multiple processing

- Step 2: BoQ comparison with transferring (possibly with different WI type

- Step 3: Transfer via multiple processing to the desired target field

The dialog for the BoQ comparison (1st page) was adapted accordingly and the report interface extended.

Furthermore the reports for the BoQ comparison were adapted accordingly.

 

 

2040422   Short text editing

Descriptopn of changes: There are only the following options for editing short texts:

1. If the BoQ is not protected against changes use the table view and the short text column. If this is an LV whose short and long text is stored in the XHTML text format (standard for GAEB DA XML), the short text column can not be edited

2. In the Short text view, this behaves like the long text view. That means, the short text view can be used in custom views

The short text dialog for editing short texts doesn’t exist any more. This is now replaced by the short text view.

Therefore there is no longer the menu item function "Short text" as well as the key combination CTRL + F2 for opening the short text dialog.

The possibility to open the short text dialog by double-click the short text in the table view is not available any more.

 

1.7       Quantities survey

1935261   Runtime quantity survey - view REB recording

The duration of opening the view REB recording sorted by Qsec-Items. + PRNo. (BoQ ID and page row number) was significantly reduced in particular with a larger number of quantity entries. (7.5 Upd. A)

 

1.8      Textcontrol

2038348   long text initialization fails

If the text control is not installed correctly or the file is damaged, the message "The TX Text Control for short, long, or info text could not be initialized”.

 

 

 


2       Solved Problems

 

2.1              General

 

1881748   The Filter of the work item direct costs remains active also in the bid

Problem: The Filter functionality while simultaneously filtering the direct costs and the bid was faulty.

For example, if the bid is opened in the table view and then filtered the associated direct costs-WI and the filter then deactivated carried bit no longer the correct values cumulation in the group levels and were shown no more values.

Solution: The problem was solved. (7.5 Upd. A)

 

 

2.2               AFK

 

1986869   Options dialog with hourglass (wait cursor)

Problem: Depending on the type of option, the execution in the model and the GUI may take some time. However, the user did not notice that Kubus was still working

Solution: In the options dialog a hourglass is displayed.

 

 

1945203   Change OH German/English

Problem: When switching the language version from German to English and vice versa, the language switch online help was not working properly.

Solution: The Problem was solved. (7.5 Upd. A)

 

 

1947433   OH not available

Problem: When retrieving the online help a misleading message appeared, although the online help was not installed:

„The Kubus-file does not exist in the selected path:

<C:\Program Files (x86)\Kubus7\help_german\>

It will reset to the default path. "

Solution: The Problem was solved. Now the message appears: „The online help can not be opened!“ (7.5 Upd. A)

 

 

1988446   Excel AddIn for Office 2013

Problem: The Excel version from Office 2013 (32- and 64-bit) could not activate Excel-AddIn Version: 5.1c3.

Solution: The Excel AddIn was adapted to Office 2013 with new version: 5.1d1 (7.5 Upd. B)

 

 

2071776   View long text - Text completions - Performance

Problem: The opening of the text extension dialog takes "long".

Solution: This is caused by the initialization of the spell checker and the associated loading of the dictionaries. If the option "Check spelling during input" is deactivated, the text editor is now displayed immediately.

 

 

2.3              Tender-BoQ

 

1913027   Bid and direct costs are filtered -> close bid

Prerequisite: A Bid and direct costs are filtered and the respective table views are open.

 

Problem: As then closed the bid, the filter was removed in the direct costs and the entire direct costs WI was redisplayed.

 

Solution: The filter in the direct costs WI remains and the table is not rebuilt. (7.5 Upd. A)

 

 

1913027   Fixed bid price is not constant with UP shares 0.0

Problem: The distribution over the UP shares does NOT work when "grayed" (to be calculated) UP shares are initially 0.00 but costs were existing. Then the bid sum does not remain constant.

Solution: The problem was solved.

 

 

2033450   Checking oft the cost type distribution algorithm

Problem: The cost type distribution algorithm with fixed bid price did not lead to the desired results, since only the costs and not the quantities were considered.

A remnant of for excample 0.30 EUR can not be distributed to a position with a lot = 10,000, but rather to positions with amounts of <= 10.

Solution: In addition to the costs, the relevant quantities are also taken into account in the apportionment allocation.

 

 

2036146   Bid price not fix during input UP-fixed line

Problem: The bid price has been fixed because of the function "Change oncost allocation".

Then the BP does not remain constant (fixed) when entering CTG% values in lines which contain an UP fixed.

Solution: In the case of items with an UP fixed, no mark ups can be entered.

 

 

2054769   Rounding algorithmics bid oncost

Problem: The interim results were rounded too early in the oncost distribution with a fixed bid price.

SolutionThe rounding algorithmic in terms of the oncost distribution with a fixed bid price was improved.

 

 

2062696   Oncost algorithmics for surcharge items in the bid

Problem: When distributing a change to fixed items, the surcharge items were not considered correctly.

Solution: Surcharge positions are correctly taken into account when distributing a change to the fixed items.

 

 

 

2065485   Oncost distribution: special items

Problem: In the distribution of a change to fixed items, the special items (alternative, Optional items excluded TP, day work items, Non-oncosted items, item not applicable) were not correctly considered.

Solution: The exceptional items are now handled correctly and have no influence on the distribution of a change to the fixed positions.

 

 

2.4               Contract-BoQ

 

1957407   Problem with OC in EaCa/OB

Problem: One EaCa/OB  was established  without overhead costs in the general settings. In the option managemer was in "Contract BoQ / Settings / OC-rate = 0%" set.

Another user with the option settings "Contract BoQ / Settings / OC-rate = 9%" now opened this established EaCa / OB and found in the basic data the OC-rate 9% before. Although he opened the Evaluation View "Cost for contract / earned value" were there, the 9%.This occurred only when OC = NaN (empty), OC = 0.00% (equal to NaN) everything was OK.

Solution:  The Problem was solved. Only if a contract-BoQ is created, the default setting of OC is taken from the option manager. (7.5 Upd. A)

 

 

1997028   View "Input Inv-/Perf-quantities" after funct.: Open related BoQ

Problem: The contract BoQ has been opened in READONLY mode  with the function "Open related BoQ ..." from the CCtrl.

If you then opened the view  "Input Inv-/Perf-quantities" in the contract BoQ  this view was also in READONLY mode.

Then the mode was switched to EXCLUSIVE

Attempting to enter the last item / sub item or to enter an Perf quantity, Kubus was crashed.

Solution: The problem was solved. (7.5 Upd. B)

 

 

1997423   View "Input Inv-/Perf-quantities“ NOK

Problem: If the view "Input Inv- / Perf-quantities" was opened in READONLY mode and then the mode was changed to EXCLUSIVE, the view was not updated.

Solution: The problem was solved. (7.5 Upd. B)

 

 

2.5              Reports

 

1925639   Bid: Report bid

Problem: When printing the report with the "amound carried over" option, then the No. of decimal points were not issued with the correct number of digits.

Solution: The problem was solved (7.5 Upd. A)

 

 

2013098   Quantity survey: report „Enclosure to invoice“

Problem: At the end of the report, a few blank pages were issued.

Solution: The report has been corrected.7.5 Upd. B)

 

 

2.6               DC

 

1949361   Value / Time Analysis, display of BoQ structure

Problem: Processing of BoQs. The view  "Value / Time Analysis for BoQ structure" was opened and the display expanded to G1 level of the BoQ.

Now only the evaluation unit was changed from year to month. Then the table view appeared fully expanded, e.g. also the positions.

Solution: The problem was solved. The evaluation unit  "Value / Time Analysis for BoQ structure" now retains the state of the expansion of the BoQ nodes when the view is updated, e.g. from year to month after changing the evaluation unit.

 

 

1981781   Content "Cmp-ID (orig.)" is lost in the DC-BoQ

Workaroung: Select the option: "Eliminate reference, copy component ID and estimated costs".

Problem: As of version 7.4, the behavior has changed.That is, If the option "Eliminate reference, delete component ID, copy estimates costs" was selected while input a component, the field in the column "Cmd-ID (orig.)" was also emptied. (Column "Cmd-ID (orig.)" is only visible if "DC-BoQ \ Display" - "display components multicolumn" was deactivated in the option management).

Solution: The problem was solved. (7.4 Upd.G; 7.5 Upd.B; 7.5 Upd. B)

 

 

1986643, 1986823   BoQ option: Display also sub-items of the components

Problem: In the case of larger DC-BoQs with many components, the activation / deactivation of the "Display sub-items of the components" option could generate a high run-time requirement in the option management when updating the opend table. The dialog disappeared after a few seconds, but the access to the view was then not possible. The user did not notice that Kubus was still busy updating the table.

This also applied in the same way to the indirect costs and components BoQ. However, since these BoQs are significantly smaller in the normal case, the problem did not occur here.

Solution: After leaving the option management, the hourglass is now displayed and the performance for updating the table view has been significantly improved.

 

 

 

2051352   Number of items in the basic data in minus

Problem: In the basic data of an DC-BoQ, the number of items after copying by D & D in the structure view of a source BoQ in a new BoQ was negative.

Solution: The problem was solved.

 

 

2.7               Export templates

 

2031875 Subco: Import GAEB 90 D84

Problem: If an XML export template already existed and then a new XML export template should be created, a crash occurred in cube.

Solution:  The problem was solved.

 

 

2.8              Im- and Export

 

1915849   Subco: Import GAEB 90 D84

Problem: When GAEB import tenderer prices could to come under the following conditions, that not all tenderer prices have been imported since the ID comparison between GAEB file and KUBUS Subco-BI failed:

It must tenderer Prices are imported to positions with exuberant hierarchy levels are in BI non numeric before ID levels.

 

Solution: The problem was solved. (7.5 Upd. A)

 

 

2.9              Calendar

 

1895812   Input date generates error message

Requirement: In the "Period / Working Times" sheet, various from / to areas are specified.

For example: Project period 1.1.2015-31.12.2020

a) 21.08.2015 - 31.08.2015

b) 08.10.2015 - 20.10.2015

c) 27.10.2015 - 30.10.2015

d) ...

e) ...

Problem: If, for example, in period b) the from / to date was changed to 09.10.2015, which is allowed, the error message appeared
"Start / end is out of the maximum time interval \ or within another period.".
The date was accepted after OK!

Solution: The date check was revised and the problem solved.

 

 

2017709   Input working day dayinformations

Problem: If the specified working time (from - to) was changed for a specific working day, the "day information from / to" was not changed to "current day".  Also the button "Enter the current day" has not been activated.

Solution: The problem was solved.

 

 

2015165/2023010   Calendar: Value working hours / day possibly incorrect

Problem: When entering the from / to times for the current day, the working hours / day have not been updated.

Solution: The problem was solved. (7.5 Upd. B)

 

 

 

2022077   Calendar: Working hours are not updated

Problem: If the last entry in the working hours was deleted, the working hours were not updated.

Solution: The problem was solved.

 

 

2.10          Cost control

 

1952618   Amount in the variation order at reporting date change in CCtrl

Problem: A notauthorisized optional variation order was transferred to the CCtrl and the costs were in addition to the potential in the reporting date in the "variation order" column yet.

After the optional variation order was set to status = approved and the last reporting date was updated in CCtrl.

In potential came in the "variation order" column any more costs (this is OK, because they are already included in the OB), but reporting date in the "variation order" column stopped the old cost.

Solution: The problem was solved; this means: Only if a contract-BoQ is created, the default setting of OC is taken from the option manager. (7.5 Upd. A)

 

 

2002261  Exp. actual incorrect in Ct

Problem: Contract-BoQ (EaCA, OB available) is switched to an alternative structure and then a new Cost control is created.

The exp.actual is not determined correctly.

Solution: The problem was solved.

 

 

1999896  New  CCtrl  -> Kubus stopped

Problem: The table of a Contract BoQ is open and an alternative outline has been activated.

If you then set up a new cost Ctr. / Hour Ctrl and assigned the open Contract BoQ, it came to a crash after confirming with OK in the assignment dialog

Solution: The problem was solved.

 

 

2.11          Costs elements

 

1942754   Costs elements: View Estimate with CTK + ADF

Problem: If an ADF has been entered and saved in the "CTK totals + ADF" view, the "value" has been incorrectly determined in the "Estimate with CTK" view (the ADF has been taken into account - incorrect). This was only a transient problem.

Solution: The problem was solved.

 

 

1942770   Costs elements: View Estimate with CTK, unit costs are incorrect

Problem: In the cost calculation an nested cost element was applied (cost element with internal positions).

In the view "Evaluation of CTK totals + ADF " an ADF was entered and it was saved.

If the cost element was marked in the cost calculation, the "Estimate with CTK" view displayed incorrect unit costs (the ADF was included in it).

Solution: The problem was solved.

 

 

1942770   Costs elements: UC in BoQ table view are incorrect

Problem: When calculating costs, an incorrect value was displayed in the column "UC" in the table view if a discount factor was entered for the CTK used.

The consolidation at position and group level was correct.

Solution: The problem was solved.

 

 

2.12          BoQ´s general

 

1932446   Kubus / Edit ID

Problem: In a WI it was no longer possible to assign the new ID respectively via the function "Allocate new ID (overall)". The ID completely changed for the whole WI.

Solution: The problem was solved. (7.5 Upd. A)

 

 

1962305   Copy/D&D, “Free value” etc. are missing

Problem: The "free value", "free value in TCY" and "free text" columns were not copied during the drag + drop of BoQ items. The same was also true for the BoQ comparison when a BoQ was completed.

Solution: The problem was solved.

 

 

2001334   BoQ comparison UP/TP without differences

Problem: The BoQ comparison had not detected a difference when comparing UP / TP (in TCY or ECY). In this special case the values were 0.000 and NaN.

Solution: The problem was solved.

 

 

1997812  BoQ comparison: takeover incorrect

Problem: If a formula is stored in a number field, only the value was accepted, not the formula.

On the next BoQ comparison, a difference was detected and displayed.

Solution: In BoQ comparison, only the value is now checked, regardless whether it has been entered or calculated by a formula.

 

 

2048791  BoQ comparison: Source BoQ protected against modification

Problem: If the source BoQ (DC-BoQ) was protected against modification, then the function could not be called.

Solution: The BoQ comparison can now be carried out. However, the changed values such as quantity, unit, item codes, short text and long text can not be accepted.

However, the fields “Free text”, “Free value” and “Free value in TCY“ can be accepted.

 

 

2056464  BoQ comparison: Editing dialogs

Problem: When processing the editing dialogs of the BoQ comparison, it was not possible to differenciate between the editing BoQ and the comparison BoQ.

 Solution: The BoQ comparison assistant has been reworked. The corresponding names and type are now issued.

 

 

2057206  BoQ comparison: Printing CCY; TCY

Problem: When printing the "Changes log of BoQ comparison", the value "Free value TCY - before" was incorrect.

Solution: The problem was solved.

 

 

 

2057237  BoQ comparison: Report interface

Problem: Die zum Vergleich ausgewählten Datenfelder "Freier Wert" und "Freier Wert in TRW" wurden im Berichtsinterface nicht richtig übergeben. The for the comparison selected data fields "Free value" and "Free value TCY" were not passed correctly in the report interface.

Solution: The problem was solved.

 

 

2061766  Long text window

Problem: If the right edge has been moved in a docked view of the table and long text, in which the long text has the focus, the ruler is no longer displayed.

Solution: The problem was solved.

 

 

2071665  Long text window – Text completion

Problem: Although the DC is protected against modification, the context menu item "Edit text completion" was active in the long text view (the text completion has the focus).

Solution: The problem was solved.

 

 

2.13          Quantities Survey

 

1928062   QSurv: Open REB view

Problem: In a customized view, the view REB recording should be opened. By sorting settings and copying a lot of quantity entries occurred long waiting periods.

Solution: The problem was solved. (7.5 Upd. A)

 

 

1930209   Error in HTStructure: The ID is incompatible!

Problem: "Error in HTStructure: The ID is incompatible!" When exporting a D11 file from the quantity determination, the message was displayed.

Solution: The problem was solved. (7.5 Upd. A)

 

 

2015134   QSurv: Error in DA11 Imports

Problem. The REB formula numbers FN00 and 91 were not handled correctly during DA11 import. The PRNo page row no.s were rejected in the field value during the import process.

Solution: The problem was solved. (7.5 Upd. B)

 

 

2043649   QSurv: Position-related analysis incorrect

Problem; In a quantities survey, a Qsec is generated from a Subcontractor evaluation and the second Qsec from a DC / Order-BoQ.

In the position-based analysis, the items from the Subcontractor evaluation did not provide any share

Solution: The problem was solved.

 

 

 

 

 

2.14          Average wages

 

1923419   AW: Views are not displayed correctly

Problem: The standard views "kalkulation Average wage ", " social costs " and "Additional wage costs " were optically not displayed correctly.

Solution: The problem was solved. (7.5 Upd. A)

 

 

2.15          Subcontractor evaluation

 

1905922   Subco-sub descriptions in the Enquiry WI

Problem:  In a Subco-BI copied sub descriptions position, of an DC-BI. These test items were not printed in Inquiry WI.

Solution: The problem was solved. (7.5 Upd. A)

 

 

1936834   Subco-BI: Costs can´t returned back (from EARS00001933986)

Problem: In a Subco-BI links had disappeared with source items and could not be re-create.

The cost can´t be returned  to the source WI.

Solution: The problem (dataerror) was solved. (7.5 Upd. A)

 

 

1937911   Subco-BoQ: Cost return with quantities in s-items.

Problem: When the costs in CTK were returned from an Subco-BoQ for s-items (in DC or CT), the "old" s-item was no longer set to “cancelled” and no new s-item with all costs was created.

Solution: The problem was solved.

 

 

1937926   Subco-BoQ: return to CTK of items with sub-items (from EARS00001933986)

Problem The return of the cost of subco-Items in items with sub items in CTK of BoQ was not performed with the message "The estimated costs has got Sub cost types".

Solution: The problem was solved. (7.5 Upd. A)

 

 

1938399   Subco-BoQ: return to CTK of items (from EARS00001933986)

Problem: The return of the cost of subco-Items in CTK´s of BoQ-items was not performed with the message : „Unhandled exception: HTArithDivideException“.The sestination item had sub-items with flag = "G".

Solution: The problem was solved. (7.5 Upd. A)

 

 

 

 

1938399   Subco-BoQ + Cost elements, Editing long text

Problem: If the long text was changed in a position in a Subco-BoQ, the change was not automatically done in the source position in the assigned CE-BoQ.

Solution: The problem was solved. (7.5 Upd. A)

 

 

2039168   Subco-BoQ: Drag & Drop incorrect

Problem: When copying a complete group from an DC-BoQ to a Subco-BoQ per Drag & Drop, if the option “Only subitems” was selected, the text items (within an item with subitems) were not copied

Solution: The problem was solved. (7.5 Upd.C)

 

 

2034553   Subco-BoQ: Create s-items via D&D

Problem: Related to BoQs with one text items below an item. If one item was copied from an DC-BoQ to a subco-BoQ, the dialog with the query appeared, questioning what should be done with the sub-items, although there were no items at all.

Solution: The problem was solved. The dialog no longer appears. (7.5 Upd.C)

 

 

2033765   Subco-BoQ: Create s-items via D&D

Problem: Items of the Subco-BoQ should be generated via drag & drop from the structural view of DC-BoQ.

It was noticeable that text items were only taken into account when the items were individually selected and then copied.

If the entire group was selected to be copied, the text items are not included (except the first).

Solution: The problem was solved. Now the text items also included. (7.5 Upd.C)

 

 

 

2061226   Subco-BoQ - tender evaluation table "incomplete bids"

Problem: If the function "adjust incomplete bits" has been called in the tender evaluation table, and the UP-adjustm. acc. to: “ideal, mean value and maxima” were selected, the UP adjustment was not carried out correctly and the TP was not determined correctly.

Solution: The problem was solved. (7.5 Upd.C)

 

 

2.16          Projectcalendar

 

2040760   Delete input of the current day

Problem: The information to the current day in the calendar was not reset correctly via the button "Delete input of the current day", if the view "Calendar" had lost the focus in the meantime (for example, if a schedule or the basic data were checked).

Solution: The problem was solved. (7.5 Upd.C)

 

 

2.17           Masterdata

 

1922079   Copy masterdatas: currencies NOK

Problem: A new Access DB was created with the Prototype.KDB and then the master currencies from another DB were copied to this new one.

The result was that not all currencies were copied as well as transient, the EUR (the key currency) had disappeared

Solution: A new Prototype.KDB was provided. The problem no longer occurs.

 

 

2.18          Component-LV

 

1961162   Components-BoQ field total Quantity and multitasking

Problem: The "Total quantity" field was not treated by the multitasking.

Solution: In multitasking, the "total quantity" can be selected as a value and transferred to the "free value" attribute and is available for further transport.

 

 

2.19          Currency

 

1925972   Delete duplicate Currencies

Problem: Allow deleting duplicate currencies in currency BOs.

The multiple currencies often arise with the work in the new Access DBs and disturb later Kubus functions. (S.A .: EARS00001925893). With the use of new Access DB Prototypes (from 7.4G, 7.5) the error no longer occurs.

Solution: The problem was solved. (7.5 Upd. A)

 

3                   Current problems

 

3.1              Contract-BoQ

 

210844     Variation order and Oncost

Includes a variation order at the end a S:S-item, then in the totals of the to be surcharged S:S-items (UP incl SDF respectively AwdL/unit) all items get included, the status of the variation order is not considered. However, only the variation order items can be taken into account, which themselves contribute to the group total, e.g. whose values TP or AwdL are not in brackets.