Kubus
Release Notes to the version 7.6
Düsseldorf, 11th
Juli 2017
Survey
Key aspects of Kubus 7.6
1. Further Enhancements
Development of the function: "Edit
ID´s -> search for duplicate IDs"
·
Base and variant positions are not to be
considered!
Word
processing – Spell Checker¸ Corrections in the display of texts.
·
Edit short text´s
·
Text width longtext
·
Edit text completions in the longtext
BoQ-comparison
and data transfer:
·
BoQ-comparison between different WI
categories
·
Further enhancement of BoQ-comparison
um die Felder: Freier Wert, Freier Text und
Freier Wert in TRW
·
BoQ-comparison protected DC-BoQ´s
Mark-ups in the bid
·
Bid price fix in function „Change oncost
allocation…“
Quantities survey: DA11-import
·
PRNo-page row no.s are accepted in the
Value field at import
Excel 2013 - ExportLV.xla
·
Adaption of Excel Add-Ins and new version
(5.1d1)
2.
Enhancements
Performance enhancements
·
WI-Option “Sub-items of components ....”
·
Item-related evaluation
3.
Operating
systems and databases
The Kubus-Version 7.6 will be released for
the operating systems Windows 10 and Windows Server 2012.
Furthermore the databases Oracle 11g (64
Bit) aund 12c (only 64Bit) will be released for:
-
Windows Server 2008 R2 (x64),
-
Windows Server 2012 (x64) und
-
Windows Server 2012 R2 (x64)
4.
User guide
New functions in the KUBUS 7.6 project
structure:
·
Apply last used PS settings and selections
· Apply last WI-views
Compatibility
1.
This Kubus-Version is based on the database-version 44.8.
The previous Kubus-version (7.5) also requires the schema
44.8 and so that no DB evolutions are necessary when upgrading.
Databases updated to Schema 44.x can be used with the Kubus
versions 7.2, 7.3, 7.4, 7.5 and 7.6. Previous versions of cube (up to 7.1) can
not be used with 44.x DBs.
2.
Only reports- and export form sheet – libraries of the
version 49.1 can be used with this Kubus-Version.
3.
This Kubus-Version works with the version 5.3 of the item
data interface. This is not downwards compatible with previous versions.
General remarks |
In
this document, new or improved functions as well as solved and existing problems
of the Kubus-Version 7.6 are described. |
All
solved ("Fixed") problems, which are enlisted in this document, are
closed ("Closed") 2 months after the delivery of the version 7.6,
if no reply is received from the customer. Naturally, there is an option to
reopen a closed ticket in case of a separate request. |
The Support (Hotline, Consulting, etc.) is provided
only for the latest Kubus-Version as well as for the two previous versions. |
We
point out here that the Hardware-, Operating system- and Database requirements,
which are necessary for the operations of Kubus, are provided by us any time
on request in the latest version. |
In
case of installing a new Kubus-Version, we recommend to install also available
updates for the appropriate version. Those can be downloaded from the Capgemini-Server
(www.de.capgemini.com/KUBUS). |
Contents
1913860, 1913862
Funktion Edit ID, search for
duplicate IDs
2000139 Option management: Table, Column Width, Layout
2059348 PS
extention - Customisations in the
user guidance
2032276 Improve the default GUI behavior of table
cells
2047627 Cost type
groups, Generation of values and representation
2063975 Column
widths in the dialog UP-shares / Currency shares
2033437 Bid: Dialog Cost type groups
2041888 Bid:
Define Cost type position / group
1409910 Overhead costs with more than two decimal places
1947414 Calculation of Discount factor, replace term
"cumulative"
2031029 DC-BoQ:
Editing of text completions
1449025 Top
sheet: Enhancement in Indirect costs
1896830 Duplicate window for short text
1879950 BoQ
comparison, further Enhancements
2026423 BoQ
comparison between different WI
categories
1935261 Runtime quantity survey - view REB
recording
2038348 long text
initialization fails
1881748 The
Filter of the work item direct costs remains active also in the bid
1986869 Options dialog with hourglass (wait
cursor)
1945203 Change OH
German/English
1988446 Excel
AddIn for Office 2013
2071776 View long
text - Text completions - Performance
1913027 Bid and
direct costs are filtered -> close bid
1913027 Fixed bid
price is not constant with UP shares 0.0
2033450 Checking
oft the cost type distribution
algorithm
2036146 Bid price
not fix during input UP-fixed line
2054769 Rounding
algorithmics bid oncost
2062696 Oncost
algorithmics for surcharge items in the bid
2065485 Oncost
distribution: special items
1957407 Problem
with OC in EaCa/OB
1997028 View
"Input Inv-/Perf-quantities" after funct.: Open related BoQ
1997423 View
"Input Inv-/Perf-quantities“ NOK
2013098 Quantity
survey: report „Enclosure to invoice“
1949361 Value /
Time Analysis, display of BoQ structure
1986643, 1986823 BoQ option: Display also sub-items of the
components
2051352 Number of
items in the basic data in minus
2031875 Subco: Import GAEB 90 D84
1915849 Subco:
Import GAEB 90 D84
1895812 Input date generates error message
2017709 Input
working day dayinformations
2015165/2023010
Calendar: Value working hours
/ day possibly incorrect
2022077 Calendar:
Working hours are not updated
1952618 Amount in
the variation order at reporting date change in CCtrl
2002261 Exp.
actual incorrect in Ct
1999896 New CCtrl -> Kubus stopped
2048791 BoQ
comparison: Source BoQ protected
against modification
2056464 BoQ comparison: Editing dialogs
2057206 BoQ comparison: Printing CCY; TCY
2057237 BoQ comparison: Report
interface
2071665 Long text window – Text
completion
1930209 Error in
HTStructure: The ID is incompatible!
2015134 QSurv: Error in DA11 Imports
2043649 QSurv: Position-related analysis incorrect
1923419 AW: Views
are not displayed correctly
1905922 Subco-sub
descriptions in the Enquiry WI
1936834 Subco-BI:
Costs can´t returned back (from EARS00001933986)
1937911
Subco-BoQ: Cost return with quantities in s-items.
1937926
Subco-BoQ: return to CTK of items with sub-items (from EARS00001933986)
1938399
Subco-BoQ: return to CTK of items (from EARS00001933986)
1938399 Subco-BoQ
+ Cost elements, Editing long text
2039168
Subco-BoQ: Drag & Drop incorrect
2034553
Subco-BoQ: Create s-items via D&D
2033765
Subco-BoQ: Create s-items via D&D
2061226 Subco-BoQ
- tender evaluation table "incomplete bids"
2040760 Delete input of the current day
1922079 Copy masterdatas: currencies NOK
1961162
Components-BoQ field total Quantity and multitasking
1925972 Delete duplicate Currencies
210844 Variation order and Oncost
1 Functional enhancements
|
1.1
General
|
1913860, 1913862 Funktion Edit ID, search for duplicate IDsWhen checking an BoQ, whether IDs are duplicated
or in the right order, base and variant positions, which by definition have
the same ID, are no longer considered. |
2000139
Option management: Table, Column
Width, Layout
In Option
management, under Column Properties Table, the frame has now been adjusted so
that the column "Activability" is now displayed completely. |
2059348
PS extention - Customisations in the user guidance
General: To use the new
functionality, user-dependent data are stored. These data to
be stored are settings of a KUBUS user session. They are
therefore stored in the user registry in the same way as the PS filter
settings. The new
functions are controlled by two new buttons, which were added to the PS
structure filter dialog. Extentions: 1. The last open / close states of the DB
category and DB nodes should be restored during the next PS setup. 2. The last used / opened "PS
nodes" should be preselected during the next PS setup 3. The PS filter tree should be better
synchronized with the PS view (opening and selecting of the analog node) These three
functions are activated in the PS filter dialog by selecting the check box
"Use last used PS settings and selectings". 4. The last used / opened views should be
opened again by double-clicking or by returning to the work item name. This function
is activated in the PS filter dialog by selecting the check box "Use
last used work item views". If these
checkboxes are unchecked, the old PS behavior is effective. |
|
1.2
Bid
|
2032276 Improve the default GUI behavior of table cellsThe indication behavior
of the cells after calling the funktion
"Change oncost allocation.." in the "Table" view of the
offer has been improved. |
2047627
Cost type groups, Generation of values and representation
The display of
the cells of Cost type groups (readonly or editable) in the view
"table" of the offer has been improved. |
2063975
Column widths in the dialog UP-shares / Currency
shares
The columns in the dialog function "Define UP shares
..." in tge bid have now been broadened - in the tab Cost
type groups the column: UP shares - in the tab Currency
shares the column: short text |
2033437
Bid: Dialog Cost type groups
The dialog "Define
Cost type positions/groups" has
been revised. Depending on
the selection, the bid sum remains fixed and the selected settings remain
even after closing and opening KUBUS |
2041888 Bid: Define Cost type position / groupIn the dialog Define
Cost type position / group, the BoQs
associated with the offer are displayed open with the first level. |
1.3
Contract-BoQ
|
1409910
Overhead
costs with more than two decimal places
In Option management of the contract-BoQ the
number of decimal places can be set for the overhead costs (default: two
decimal places). This
specification is taken into account in the basic data of the contract-BoQ; i.e. more than two decimal places can be
considered. |
1.4
Direct costs
|
1947414 Calculation of Discount factor, replace term "cumulative"The term "Cumulative
Computation of the discount factor " was
replaced by " Multiplicative calculation of the discount factor ". (7.5 Upd. A) |
2031029 DC-BoQ:
Editing of text completions
The editing of the text completion was reviewed. If the protection
"Protect service description" is canceled in DC-BoQ, the text
completions may also be changeable. (7.5 Upd. C). |
1.5 Top sheet |
1449025 Top sheet: Enhancement in Indirect costsIn the top
sheet, the indirect costs for the selected sales-related IC are now displayed in brackets in ECY, as well as the percentage
drawn on the bid price. |
1.6 BoQ general
|
1896830 Duplicate window for short text
Double-click on the short text field opens not a
short text window any more. The short text can only be accessed and edited
via the standard view: "Short text". |
2001245 Display long textAn additional checkbox was installed in the option management, with which the set text width can be activated or deactivated. The setting occured via the node: KUBUS -> tab: RTF text view format - text width. If the checkbox
is activated, the text width is automatically updated in open long text views.
This also applies to all text views. |
1879950 BoQ comparison, further EnhancementsThe values from the fields "Free text", "Free value" and "Free value in TCY" can now also be compared and accepted with the BoQ comparison. |
2026423 BoQ comparison between different WI categoriesThe BoQ comparison is now also possible between WI´s of different BoQ categories. Furthermore, with this extension, a value / several values can now be transferred from a P (position) into each corresponding P with an equal ID independent of the WI type. - Step 1: transfer
the values per position P into free columns using multiple processing - Step 2: BoQ comparison with transferring (possibly with
different WI type - Step 3: Transfer via multiple processing to the desired target field The dialog for
the BoQ comparison (1st page) was adapted accordingly and the report
interface extended. Furthermore the
reports for the BoQ comparison were adapted accordingly. |
2040422 Short text editingDescriptopn of
changes: There are only the
following options for editing short texts: 1. If the BoQ
is not protected against changes use the table view and the short text column. If this is an LV whose short and
long text is stored in the XHTML text format (standard for GAEB DA XML), the
short text column can not be edited 2. In the Short text view, this behaves like the long text view. That means, the short text view can be used in custom views The short text dialog
for
editing short texts doesn’t exist any more. This is now replaced by the short text view. Therefore there
is no longer the menu item function "Short text" as well as the key
combination CTRL + F2 for opening the short text dialog. The possibility
to open the short text dialog by double-click the short text in the table
view is not available any more. |
1.7
Quantities
survey
|
1935261 Runtime quantity survey - view REB recordingThe duration
of opening the view REB recording sorted by Qsec-Items. + PRNo. (BoQ ID and
page row number) was significantly reduced in particular with a larger number of quantity entries. (7.5 Upd. A) |
1.8 Textcontrol |
2038348 long text initialization failsIf the text
control is not installed correctly or the file is damaged, the message
"The TX Text Control for short, long, or info text could not be initialized”. |
|
2 Solved
Problems
|
|
|
2.1
General
|
|
|
1881748 The Filter of the work item direct costs remains active also in the bidProblem: The Filter functionality while simultaneously filtering the direct
costs and the bid was faulty. For example, if
the bid is opened in the table view and then filtered the associated direct
costs-WI and the filter then deactivated carried bit no longer the correct
values cumulation in the group levels and were shown no more values. Solution: The problem was solved. (7.5 Upd. A) |
|
|
2.2
AFK
|
|
|
1986869 Options dialog with hourglass (wait cursor)Problem: Depending on the type of option, the execution in the model and the GUI
may take some time. However, the user did not notice that Kubus was still
working Solution: In the options dialog a
hourglass is displayed. |
|
|
1945203 Change OH German/EnglishProblem: When
switching the language version from German to English and vice versa, the
language switch online help was not working properly. Solution: The Problem was solved. (7.5 Upd. A) |
|
|
1947433 OH not availableProblem: When retrieving the online help a misleading message appeared, although the online help was not installed: „The Kubus-file does not exist in the selected path: <C:\Program Files (x86)\Kubus7\help_german\> It will reset to the default path. " Solution: The Problem was solved. Now the message
appears: „The online help can not be opened!“ (7.5 Upd. A) |
|
|
1988446 Excel AddIn for Office 2013Problem: The Excel version from Office 2013 (32- and
64-bit) could not activate Excel-AddIn Version: 5.1c3. Solution: The Excel AddIn was adapted to Office 2013
with new version: 5.1d1 (7.5 Upd. B) |
|
|
2071776 View long text - Text completions - PerformanceProblem: The opening of the text extension dialog takes "long". Solution: This is caused by the initialization of the spell checker and the associated loading of the dictionaries. If the option "Check spelling during input" is deactivated, the text editor is now displayed immediately. |
|
|
2.3
Tender-BoQ
|
|
|
1913027 Bid and direct costs are filtered -> close bidPrerequisite: A Bid and direct costs are filtered and
the respective table views are open. Problem: As then closed the bid, the filter was
removed in the direct costs and the entire direct costs WI was redisplayed. Solution: The filter in the direct costs WI remains and the table is not rebuilt. (7.5 Upd. A) |
|
|
1913027 Fixed bid price is not constant with UP shares 0.0Problem: The distribution over the UP shares does NOT work when "grayed" (to be calculated) UP shares are initially 0.00 but costs were existing. Then the bid sum does not remain constant. Solution: The problem was solved. |
|
|
2033450 Checking oft the cost type distribution algorithmProblem: The cost type distribution algorithm with fixed
bid price did not lead to the desired results,
since only the costs and not the quantities were considered. A remnant of for
excample 0.30 EUR can not be distributed to a position with a lot = 10,000,
but rather to positions with amounts of <= 10. Solution: In addition to the costs, the relevant
quantities are also taken into account in the apportionment allocation. |
|
|
2036146 Bid price not fix during input UP-fixed lineProblem: The bid price has been fixed because of the
function "Change oncost allocation". Then the BP does not
remain constant (fixed) when entering CTG% values in lines which contain an
UP fixed. Solution: In the case of items with an UP fixed, no
mark ups can be entered. |
|
|
2054769 Rounding algorithmics bid oncostProblem: The interim results were rounded too early
in the oncost distribution with a fixed bid price. SolutionThe rounding algorithmic in terms of the
oncost distribution with a fixed bid price was improved. |
|
|
2062696 Oncost algorithmics for surcharge items in the bidProblem: When distributing a change to fixed items, the surcharge items were not
considered correctly. Solution: Surcharge positions are correctly taken into account when distributing a change to the fixed items. |
|
|
2065485 Oncost distribution: special itemsProblem: In the distribution of a change to fixed
items, the special items (alternative, Optional items excluded TP, day work
items, Non-oncosted items, item not applicable) were not correctly
considered. Solution: The exceptional items are now handled
correctly and have no influence on the distribution of a change to the fixed
positions. |
|
|
2.4 Contract-BoQ |
|
|
1957407 Problem with OC in EaCa/OBProblem: One EaCa/OB was
established without overhead costs in
the general settings. In the option managemer was in "Contract BoQ /
Settings / OC-rate = 0%" set. Another user with
the option settings "Contract BoQ / Settings / OC-rate = 9%" now
opened this established EaCa / OB and found in the basic data the OC-rate 9%
before. Although he opened the Evaluation View "Cost for contract /
earned value" were there, the 9%.This occurred only when OC = NaN
(empty), OC = 0.00% (equal to NaN) everything was OK. Solution: The Problem was
solved. Only if a
contract-BoQ is created, the default setting of OC is taken from the option
manager. (7.5 Upd. A) |
|
|
1997028 View "Input Inv-/Perf-quantities" after funct.: Open related BoQProblem: The contract BoQ has been opened in
READONLY mode with
the function "Open related BoQ ..." from the CCtrl. If you then opened
the view "Input
Inv-/Perf-quantities" in the contract BoQ this view was also in READONLY mode. Then the mode was
switched to EXCLUSIVE Attempting to enter
the last item / sub item or to enter an Perf
quantity, Kubus was crashed. Solution: The problem was solved. (7.5 Upd. B) |
|
|
1997423 View "Input Inv-/Perf-quantities“ NOKProblem: If the view "Input Inv- /
Perf-quantities" was opened in READONLY mode and then the mode was
changed to EXCLUSIVE, the view was not updated. Solution: The problem was solved. (7.5 Upd. B) |
|
|
2.5
Reports
|
|
|
1925639 Bid: Report bid
Problem: When printing the report with the "amound carried over" option, then the No. of decimal points were not issued with the correct number of digits. Solution: The problem was solved (7.5 Upd. A) |
|
|
2013098 Quantity survey: report „Enclosure to invoice“Problem: At the end of the report, a few blank pages
were issued. Solution: The report has been corrected.7.5 Upd. B) |
|
|
2.6
DC
|
|
|
1949361 Value / Time Analysis, display of BoQ structureProblem: Processing of BoQs. The view "Value / Time Analysis for BoQ
structure" was opened and the display expanded to G1 level of the BoQ. Now only the
evaluation unit was changed from year to month. Then the table view appeared
fully expanded, e.g. also the positions. Solution: The problem was solved. The evaluation unit "Value /
Time Analysis for BoQ structure" now retains the state of the expansion
of the BoQ nodes when the view is updated, e.g. from year to month after
changing the evaluation unit. |
|
|
1981781 Content
"Cmp-ID (orig.)" is lost in the DC-BoQ Workaroung: Select the option: "Eliminate
reference, copy component ID and estimated costs". Problem: As of version 7.4, the behavior has
changed.That is, If the option "Eliminate reference, delete component
ID, copy estimates costs" was selected while input a component, the
field in the column "Cmd-ID (orig.)" was also emptied. (Column
"Cmd-ID (orig.)" is only visible if "DC-BoQ \ Display" -
"display components multicolumn" was deactivated in the option management). Solution: The problem was solved. (7.4 Upd.G; 7.5 Upd.B; 7.5 Upd. B) |
|
|
1986643, 1986823 BoQ
option: Display also sub-items of the components
Problem: In the case of larger DC-BoQs with many
components, the activation / deactivation of the "Display sub-items of
the components" option could generate a high run-time requirement in the
option management when updating the opend table. The dialog disappeared after
a few seconds, but the access to the view was then not possible. The user did
not notice that Kubus was still busy updating the table. This also applied in
the same way to the indirect costs and components BoQ. However, since these
BoQs are significantly smaller in the normal case, the problem did not occur
here. Solution: After leaving the option management, the
hourglass is now displayed and the performance for updating the table view
has been significantly improved. |
|
|
2051352 Number of items in the basic data in minusProblem: In the basic data of an
DC-BoQ, the number of items after copying by D & D in the structure view
of a source BoQ in a new BoQ was negative. Solution: The problem was solved. |
|
|
2.7
Export templates
|
|
|
2031875 Subco: Import GAEB 90 D84Problem: If an XML export template already existed
and then a new XML export template should be created, a crash occurred in
cube. Solution: The
problem was solved. |
|
|
2.8
Im-
and Export
|
|
|
1915849 Subco: Import GAEB 90 D84Problem: When GAEB import tenderer prices could to
come under the following conditions, that not all tenderer prices have been
imported since the ID comparison between GAEB file and KUBUS Subco-BI failed:
It must tenderer
Prices are imported to positions with exuberant hierarchy levels are in BI
non numeric before ID levels. Solution: The problem was solved. (7.5 Upd. A) |
|
|
2.9
Calendar
|
|
|
1895812 Input date generates
error message
Requirement: In the
"Period / Working Times" sheet, various from / to areas are
specified. For example: Project period
1.1.2015-31.12.2020 a) 21.08.2015 - 31.08.2015 b) 08.10.2015 - 20.10.2015 c) 27.10.2015 - 30.10.2015 d) ... e) ... Problem: If, for example, in period b) the from /
to date was changed to 09.10.2015, which is allowed, the error message
appeared Solution: The date check was revised and the
problem solved. |
|
|
2017709 Input working day dayinformationsProblem: If the specified working time (from - to) was changed for a specific
working day, the "day information from / to" was not changed to
"current day". Also the
button "Enter the current day" has not been activated. Solution: The problem was solved. |
|
|
2015165/2023010 Calendar: Value working
hours / day possibly
incorrect
Problem: When entering the from / to times for the
current day, the working hours / day have not been updated. Solution: The problem was solved. (7.5 Upd. B) |
|
|
2022077 Calendar: Working hours are not updatedProblem: If the last entry in the working hours was deleted, the working hours
were not updated. Solution: The problem was solved. |
|
|
2.10
Cost
control
|
|
|
1952618 Amount in the variation order at reporting date change in CCtrlProblem: A notauthorisized
optional variation order was transferred to the CCtrl and the costs were in
addition to the potential in the reporting date in the "variation
order" column yet. After the optional variation order was set
to status = approved and the last reporting date was updated in CCtrl. In potential came
in the "variation order" column any more costs (this is OK, because
they are already included in the OB), but reporting date in the "variation
order" column stopped the old cost. Solution: The problem was solved; this means: Only if a
contract-BoQ is created, the default setting of OC is taken from the option
manager. (7.5 Upd. A) |
|
|
2002261 Exp. actual incorrect in CtProblem: Contract-BoQ (EaCA, OB available) is
switched to an alternative structure and then a new Cost control is created. The exp.actual is not determined
correctly. Solution: The problem was solved. |
|
|
1999896 New CCtrl ->
Kubus stopped
Problem: The table of a Contract BoQ is open and an alternative outline has been
activated. If you then set
up a new cost Ctr. / Hour Ctrl and assigned the open Contract BoQ, it came to
a crash after confirming with OK in the assignment dialog Solution: The problem was solved. |
|
|
2.11
Costs
elements
|
|
|
1942754 Costs elements: View Estimate
with CTK + ADF Problem: If an ADF has been entered and saved in the "CTK totals + ADF"
view, the "value" has been incorrectly determined in the
"Estimate with CTK" view (the ADF has been taken into account -
incorrect). This was only a transient problem. Solution: The problem was solved. |
|
|
1942770 Costs elements: View Estimate
with CTK, unit costs are incorrect Problem: In the cost calculation an nested cost element
was applied (cost element with internal positions). In the view "Evaluation
of CTK totals + ADF " an ADF was entered and it was saved. If the cost
element was marked in the cost calculation, the "Estimate with CTK"
view displayed incorrect unit costs (the ADF was included in it). Solution: The problem was solved. |
|
|
1942770 Costs elements: UC in
BoQ table view are incorrect Problem: When calculating costs, an incorrect value was displayed in the column
"UC" in the table view if a discount factor was entered for the CTK
used. The consolidation
at position and group level was correct. Solution: The problem was solved. |
|
|
2.12
BoQ´s general
|
|
|
1932446
Kubus / Edit ID Problem: In a WI it was no longer possible to assign the new ID respectively via the function "Allocate new ID (overall)". The ID completely changed for the whole WI. Solution: The problem was solved. (7.5 Upd. A) |
|
|
1962305 Copy/D&D, “Free
value” etc. are missing Problem: The "free value", "free value in TCY" and "free
text" columns were not copied during the drag + drop of BoQ items. The
same was also true for the BoQ comparison when a BoQ was completed. Solution: The problem was solved. |
|
|
2001334 BoQ comparison UP/TP without
differences Problem: The BoQ comparison had not detected a difference when comparing UP / TP
(in TCY or ECY). In this special case the values were 0.000 and NaN. Solution: The problem was solved. |
|
|
1997812 BoQ comparison: takeover incorrect Problem: If a formula is stored in a number field, only the value was accepted,
not the formula. On the next BoQ comparison, a difference was detected and displayed. Solution: In BoQ comparison, only the value is now checked, regardless whether it
has been entered or calculated by a formula. |
|
|
2048791
BoQ comparison: Source BoQ protected against modification
Problem: If the source BoQ (DC-BoQ) was protected against modification, then the
function could not be called. Solution: The BoQ comparison can now be carried out. However, the changed values
such as quantity, unit, item codes, short text and long text can not be
accepted. However, the fields “Free text”, “Free value” and “Free value in TCY“ can be accepted. |
|
|
2056464 BoQ comparison: Editing dialogs
Problem: When processing the editing dialogs of the BoQ comparison, it was not
possible to differenciate between the editing BoQ and the comparison BoQ. Solution: The BoQ comparison assistant has been reworked.
The corresponding names and type are now issued. |
|
|
2057206 BoQ comparison: Printing CCY; TCY
Problem: When printing the "Changes log of BoQ comparison", the value
"Free value TCY - before" was incorrect. Solution: The problem was solved. |
|
|
2057237
BoQ comparison: Report interface
Problem: Die zum Vergleich ausgewählten Datenfelder "Freier Wert" und
"Freier Wert in TRW" wurden im Berichtsinterface nicht richtig
übergeben. The for the
comparison selected data fields "Free value" and "Free value TCY"
were not passed correctly in the report interface. Solution: The problem was solved. |
|
|
2061766 Long text window
Problem: If the right edge has been moved in a docked view of the table and long text, in which the long text has the focus, the ruler is no longer displayed. Solution: The problem was solved. |
|
|
2071665 Long text window – Text completionProblem: Although the DC is protected against modification, the context menu item
"Edit text completion" was active in the long text view (the text
completion has the focus). Solution: The problem was solved. |
|
|
2.13
Quantities Survey
|
|
|
1928062 QSurv: Open REB view
Problem: In a customized view, the view REB recording should be opened. By
sorting settings and copying a lot of quantity entries occurred long waiting
periods. Solution: The problem was solved. (7.5 Upd. A) |
|
|
1930209 Error in HTStructure: The ID is incompatible!Problem: "Error in HTStructure: The ID is incompatible!" When
exporting a D11 file from the quantity determination, the message was
displayed. Solution: The problem was solved. (7.5 Upd. A) |
|
|
2015134 QSurv: Error in DA11 ImportsProblem. The REB formula numbers FN00 and 91 were not handled correctly during
DA11 import. The PRNo page row no.s were rejected in
the field value during the import process. Solution: The problem was solved. (7.5 Upd. B) |
|
|
2043649 QSurv: Position-related analysis incorrectProblem; In a quantities survey, a Qsec is generated from a Subcontractor evaluation
and the second Qsec from a DC / Order-BoQ. In the
position-based analysis, the items from the Subcontractor evaluation did not
provide any share Solution: The problem was solved. |
|
|
|
|
|
2.14
Average wages
|
|
|
1923419 AW: Views are not displayed correctlyProblem: The standard views "kalkulation Average wage ", "
social costs
" and "Additional wage costs " were optically not
displayed correctly. Solution: The problem was solved. (7.5 Upd. A) |
|
|
2.15
Subcontractor
evaluation
|
|
|
1905922 Subco-sub descriptions in the Enquiry WIProblem: In a Subco-BI
copied sub descriptions position, of an DC-BI. These
test items were not printed in Inquiry WI. Solution: The problem was solved. (7.5 Upd. A) |
|
|
1936834 Subco-BI: Costs can´t returned back (from EARS00001933986)Problem: In a Subco-BI links had disappeared with
source items and could not be re-create. The cost can´t be returned to the source WI. Solution: The problem (dataerror) was solved. (7.5 Upd. A) |
|
|
1937911
Subco-BoQ:
Cost return with quantities in s-items.
Problem: When the costs in CTK were returned from an Subco-BoQ for s-items (in DC or CT), the
"old" s-item was no longer set to “cancelled” and no new s-item
with all costs was created. Solution: The problem was solved. |
|
|
1937926
Subco-BoQ: return to CTK of items with
sub-items (from EARS00001933986)
Problem The
return of the cost of subco-Items in items with sub items in CTK of BoQ was
not performed with the message "The estimated costs
has got Sub cost types". Solution: The problem was solved. (7.5 Upd. A) |
|
|
1938399
Subco-BoQ: return to CTK of items (from
EARS00001933986)
Problem: The
return of the cost of subco-Items in CTK´s of BoQ-items was not performed
with the message : „Unhandled exception:
HTArithDivideException“.The
sestination item had sub-items with flag = "G". Solution: The problem was solved. (7.5 Upd. A) |
|
|
|
|
|
1938399 Subco-BoQ + Cost elements, Editing long textProblem: If the long text was changed in a position in a Subco-BoQ, the change was not automatically done
in the source position in the assigned CE-BoQ. Solution: The problem was solved. (7.5 Upd. A) |
|
|
2039168 Subco-BoQ: Drag & Drop incorrectProblem: When copying a complete group from an DC-BoQ to a
Subco-BoQ per Drag & Drop, if the option “Only subitems” was selected,
the text items (within an item with subitems) were not copied Solution: The problem was solved. (7.5 Upd.C) |
|
|
2034553 Subco-BoQ: Create s-items via D&DProblem: Related to BoQs with one text items below
an item. If one item was copied from an DC-BoQ to a
subco-BoQ, the dialog with the query appeared, questioning what should be
done with the sub-items, although there were no items at all. Solution: The problem was solved. The dialog no longer appears. (7.5 Upd.C) |
|
|
2033765 Subco-BoQ: Create s-items via D&DProblem: Items of the Subco-BoQ should be generated
via drag & drop from the structural view of DC-BoQ. It was noticeable
that text items were only taken into account when the items were individually
selected and then copied. If the entire group
was selected to be copied, the text items are not included (except the
first). Solution: The problem was solved. Now the text items also included. (7.5 Upd.C) |
|
|
2061226 Subco-BoQ
- tender
evaluation table "incomplete bids"
Problem: If the function "adjust incomplete bits" has been called in
the tender evaluation table, and the UP-adjustm. acc.
to: “ideal, mean value and maxima” were selected, the UP adjustment was not
carried out correctly and the TP was not determined correctly. Solution: The problem was solved. (7.5 Upd.C) |
|
|
2.16
Projectcalendar
|
|
|
2040760
Delete
input of the current day
Problem: The information to the current day in the
calendar was not reset correctly via the button "Delete input of the
current day", if the view "Calendar" had lost the focus in the
meantime (for example, if a schedule or the basic data were checked). Solution: The problem was solved. (7.5 Upd.C) |
|
|
2.17
Masterdata
|
|
|
1922079 Copy masterdatas: currencies
NOK
Problem: A new Access DB was created with the
Prototype.KDB and then the master currencies from another DB were copied to
this new one. The result was that
not all currencies were copied as well as transient, the EUR (the key
currency) had disappeared Solution: A new Prototype.KDB was provided. The
problem no longer occurs. |
|
|
2.18 Component-LV |
|
|
1961162 Components-BoQ field total Quantity and multitaskingProblem: The "Total quantity" field was
not treated by the multitasking. Solution: In multitasking, the "total
quantity" can be selected as a value and transferred to the "free
value" attribute and is available for further transport. |
|
|
2.19
Currency
|
|
|
1925972 Delete duplicate
Currencies
Problem: Allow deleting duplicate currencies in currency BOs. The multiple
currencies often arise with the work in the new Access DBs and disturb later
Kubus functions. (S.A .: EARS00001925893). With the
use of new Access DB Prototypes (from 7.4G, 7.5) the error no longer occurs. Solution: The problem was solved. (7.5 Upd. A) |
|
3 Current problems |
|
|
3.1
Contract-BoQ
|
|
|
210844 Variation
order and Oncost
Includes a variation order at the end a S:S-item, then in the totals of the to be surcharged S:S-items (UP incl SDF respectively AwdL/unit) all items get included, the status of the variation order is not considered. However, only the variation order items can be taken into account, which themselves contribute to the group total, e.g. whose values TP or AwdL are not in brackets. |
|
|